- Title
- Construction of a 54-inch continuously welded steel watermain laid above ground
- In
- Journal of the Institution of Engineers, Australia
- Imprint
- vol. 18, no. 4-5, Apr-May 1946, pp. 93-99
- ISBN/ISSN
- 0020-3319
- Description
This paper, No.912, originated in the Newcastle Division of The Institution, and was presented before a General Meeting of the Division, on 26th October, 1945. Colonel J. M. C. Corlette CMG DSO VD BE MIEAust was formerly Chief Engineer, Hunter District Water Board, and is now practising as a Consulting Engineer in Newcastle, N.S.W. Mr. W. S. Smallman AMIEAust is an Engineer, in the Hunter District Water Board, Newcastle.
- Abstract
The paper describes the basis of design, methods of construction, and results obtained for a 54-in. mild steel pipeline laid above ground and welded electrically into a continuous line. The pipe is part of a duplication of the conduit conveying water from the Chichester Reservoir to Newcastle. Expansion and contraction due to temperature changes are prevented by reinforced concrete anchorages which are designed to resist forces due to temperature and to water pressure.